The operating costs can be broken down into three major areas:
- Maintenance.
- Electrical and/or diesel fuel power requirements.
- Non-biodegradeable solid waste disposal.
Maintenance can be provided by a Full Service Maintenance Agreement or on an as-required basis.
However, given the economies of scale, it is almost certain that the FSMA option will provide the lowest overall cost and most reliable service.
The power requirements are dependent upon the amount of electrical and/or diesel energy required. As a guide, the Bio-Xpress Reactor model 700 will normally consume less than 5,000 watts at peak operation hourly. The overall power requirements of the installed Bio-Xpress Sewer Mining Station will be dependent upon the level of ancillary equipment installed.
The solid waste from the buffer tank can be stored in secure bins destined for approved land-fill or destroyed in a high energy diesel or electric incinerator housed within the Bio-Xpress Sewer Mining Station.